iGrafx
Track length is the weight of the criterion. Fill is the score.Rubric v1
- Modeling capabilityweight 2012 out of 20
- Ease of learningweight 2015 out of 20
- Results and experimentationweight 2014 out of 20
- Pricing and total costweight 154 out of 15
- Visualization and communicationweight 105 out of 10
- Platform and deploymentweight 109 out of 10
- Learning resources and supportweight 53 out of 5
Verdict. The most interesting product in this assessment for an organization that already has the event data, because it is the only one that turns that data into the simulation baseline instead of asking a modeler to estimate it. It is also the only one that runs in a browser. Against that, it is a platform rather than a simulation tool: the depth a dedicated discrete event product carries in replications and confidence ranges is not documented here, and a buyer who wants only simulation is buying a great deal more than that. The right comparison is not against Arena or FlexSim. It is against doing process work in a spreadsheet and a mapping tool.
Strengths
- Runs in a browser. Every dedicated simulation product in this assessment is a Windows desktop install, and this is the one that is not
- Process mining feeds the simulation: durations, resource usage and routing probabilities taken from recorded event data become the baseline, rather than being estimated by a modeler
- Resources, shifts, workdays, holidays and overtime are documented as first class modeling concepts, which is more scheduling detail than most process mapping tools carry
- One platform covering mining, mapping, simulation and risk, so the model a simulation runs on is the same model the organization governs
Limits
- No price published for any edition, and the free trial is seven days behind a form rather than a permanent edition
- The documentation names thirteen distributions but documents no replication count or confidence range, the thing that separates a simulation that reports a range from one that reports a single answer
- Simulation is one capability inside a platform bought for other reasons, so a buyer whose only requirement is simulation is paying for mining, repository and risk management as well
- No three dimensional view, and nothing in the published material addresses spatial or physical layout questions
This assessment is built from published vendor documentation, product materials and pricing pages, current at the verification date shown. We do not claim hands on testing of the products covered. Weighted total 62 of 100.